The backlog created an environment of extreme pressure for healthcare professionals, affecting their ability to deliver timely and quality assessments. The existing workforce was stretched thin, unable to cope with the increasing demand for CHC reviews within the stipulated timeframes.
We deployed a fully qualified and trained workforce to support the ICS CHC teams. This workforce brought expertise in clinical assessments, documentation, and quality assurance.
Our team worked collaboratively with the ICB to determine the optimal rate and capacity at which the additional workforce could operate. This ensured that the local team was adequately supported without compromising on the quality of reviews.
As a result of our work together we:
This case study underscores the importance of adaptability and proactive measures in managing increasing demands within healthcare systems, ultimately leading to improved outcomes for both patients and healthcare professionals.
NHS Lincolnshire ICB
NHS Lincolnshire ICB
01/10/2023
Pressures on CHC review backlog and wait times
Assessment and review services